This paper documents the experiences from the Karonga Lakeshore Groundwater Project, a small rural water supply project in northern Malawi, and emphasizes that village level operation and maintenance (VLOM) is not a technical but a community
concept.
Title | Village level operation and maintenance of handpumps : experiences from Karonga, Malawi |
Publication Type | Progress Report |
Year of Publication | 1996 |
Authors | Noppen, D |
Secondary Title | Project and programme papers / IRC |
Volume | no. 3-E |
Pagination | viii, 69 p. : 6 boxes, 21 fig. |
Date Published | 1996-01-01 |
Publisher | IRC |
Place Published | The Hague, The Netherlands |
Keywords | afridev pumps, bucket pumps, cab97/2, case studies, community management, design criteria, hand pumps, institutional framework, karonga lakeshore integrated rural groundwater supply project (malawi), maintenance, malawi, operation, rural areas, sustainability, vlom pumps, water committees |
Abstract | This paper documents the experiences from the Karonga Lakeshore Groundwater Project, a small rural water supply project in northern Malawi, and emphasizes that village level operation and maintenance (VLOM) is not a technical but a community |
Notes | 25 ref. |
Custom 1 | 232.2, 824 |